YAW RATE AND ACCELERATION SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL YAW RATE AND ACCELERATION SENSOR


    C196622
  1. Connect the connector to the yaw rate and acceleration sensor.

    NOTICE:
    Make sure that the yaw rate and acceleration sensor connector is connected securely.

  1. Insert the yaw rate and acceleration sensor with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    NOTICE:
    1. Do not damage the yaw rate and acceleration sensor.
    2. Make sure that the yaw rate and acceleration sensor is installed securely.



2. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for Manual Transaxle)


B216317
  1. Install the shifting hole cover onto the shift lever.

  1. Engage the 8 claws and install the console upper panel.



3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for CVT)


    B214167
  1. Engage the 8 claws and install the console upper panel.



4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



6. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION

HINT:
(Click here).



7. CHECK VSC SENSOR SIGNAL

HINT:
(Click here).